{"id":5687,"date":"2018-07-12T10:16:47","date_gmt":"2018-07-12T10:16:47","guid":{"rendered":"http:\/\/localhost\/la-comunidad-de-madrid-adjudica-la-redaccion-del-proyecto-de-obras-de-la-linea-11-de-metro-por-18-millones-y-un-plazo-de-20-meses\/"},"modified":"2018-07-12T10:16:47","modified_gmt":"2018-07-12T10:16:47","slug":"la-comunidad-de-madrid-adjudica-la-redaccion-del-proyecto-de-obras-de-la-linea-11-de-metro-por-18-millones-y-un-plazo-de-20-meses","status":"publish","type":"post","link":"https:\/\/observatoriomovilidad.es\/en\/la-comunidad-de-madrid-adjudica-la-redaccion-del-proyecto-de-obras-de-la-linea-11-de-metro-por-18-millones-y-un-plazo-de-20-meses\/","title":{"rendered":"La Comunidad de Madrid adjudica la redacci\u00f3n del proyecto de obras de la l\u00ednea 11 de Metro por 1,8 millones y un plazo de 20 meses"},"content":{"rendered":"<p><img decoding=\"async\" height=\"91\" width=\"180\" style=\"margin-right: 10px; float: left;\" alt=\"noticia_20180712_madrid\" src=\"images\/stories\/08_noticias\/2018_07\/noticia_20180712_madrid.JPG\" \/><\/p>\n<p>El contrato incluye el estudio de la actuaci\u00f3n a trav\u00e9s del an\u00e1lisis de los antecedentes y condicionantes existentes, la tramitaci\u00f3n ambiental del proyecto y su redacci\u00f3n.<\/p>\n<p><!--more--><\/p>\n<div style=\"text-align: justify;\">\n<p>El Consejo de Gobierno ha conocido el pasado martes 10 la propuesta de adjudicaci\u00f3n para la redacci\u00f3n del proyecto de ampliaci\u00f3n de la l\u00ednea 11 de Metro de Madrid, que tendr\u00e1 un coste de 1,8 millones de euros y un plazo de ejecuci\u00f3n de 20 meses.<\/p>\n<p>\u00abLas futuras obras supondr\u00e1n la entrada en servicio de 6,5 nuevos kil\u00f3metros en la l\u00ednea, uniendo Plaza El\u00edptica con Conde de Casal (l\u00ednea 6) y har\u00e1n que la red sume un total de 300 kil\u00f3metros\u00bb, ha destacado el vicepresidente, consejero de Presidencia y portavoz regional, Pedro Roll\u00e1n, en rueda de prensa.<\/p>\n<p>El vicepresidente ha hecho hincapi\u00e9 en que se busca \u00abdar un impulso\u00bb al proyecto para ampliar el suburbano. \u00abEl objeto de este contrato es estudiar y definir las necesidades t\u00e9cnicas y medioambientales de las obras que han de llevarse a cabo para hacer realidad el proyecto, con un grado de desarrollo que permita su contrataci\u00f3n y ejecuci\u00f3n\u00bb, ha explicado.<\/p>\n<p>Posteriormente, el Gobierno regional ha explicado que la adjudicaci\u00f3n del contrato de servicios ha reca\u00eddo en la uni\u00f3n temporal de empresas (UTE) formada por Geoconsult Espa\u00f1a Ingenieros Consultores, Investigaci\u00f3n y Control Calidad y Audingintraesa.<\/p>\n<p>El contrato incluye el estudio de la actuaci\u00f3n a trav\u00e9s del an\u00e1lisis de los antecedentes y condicionantes existentes, la tramitaci\u00f3n ambiental del proyecto y su redacci\u00f3n. Se trata de un documento de una alta especializaci\u00f3n t\u00e9cnica debido a la envergadura de la obra.<\/p>\n<p>El trabajo se realizar\u00e1, indican desde el Ejecutivo, \u00abpor un equipo multidisciplinar y con una amplia experiencia en campos como la geolog\u00eda, geot\u00e9cnica, c\u00e1lculo estructural, trazados ferroviarios y de metro, topograf\u00eda, urbanismo, patrimonio, arqueolog\u00eda, medio ambiente, ruidos y vibraciones y prevenci\u00f3n de riesgos materiales\u00bb.<\/p>\n<p>Seg\u00fan Roll\u00e1n, con este proyecto, que estar\u00e1 listo para finales del pr\u00f3ximo a\u00f1o para poder licitar las obras a comienzos del 2020, \u00abse da respuesta a una demanda hist\u00f3rica de los usuarios, especialmente de los vecinos de Carabanchel y tambi\u00e9n de los de La Fortuna de Legan\u00e9s\u00bb.<\/p>\n<p><a style=\"line-height: 1.6;\" href=\"https:\/\/www.lavanguardia.com\/local\/madrid\/20180703\/45609867508\/la-comunidad-adjudica-la-redaccion-del-proyecto-de-obras-de-la-linea-11-por-18-millones-y-un-plazo-de-20-meses.html\" target=\"_blank\" title=\"La Comunidad de Madrid adjudica la redacci\u00f3n del proyecto de obras de la l\u00ednea 11 de Metro por 1,8 millones y un plazo de 20 meses\" rel=\"noopener\">Lea la noticia completa aqu\u00ed<\/a><\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>El contrato incluye el estudio de la actuaci\u00f3n a trav\u00e9s del an\u00e1lisis de los antecedentes y condicionantes existentes, la tramitaci\u00f3n ambiental del proyecto y su redacci\u00f3n.<\/p>","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":"","_links_to":"","_links_to_target":""},"categories":[51],"tags":[],"class_list":["post-5687","post","type-post","status-publish","format-standard","hentry","category-noticias-noticias"],"_links":{"self":[{"href":"https:\/\/observatoriomovilidad.es\/en\/wp-json\/wp\/v2\/posts\/5687","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/observatoriomovilidad.es\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/observatoriomovilidad.es\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/observatoriomovilidad.es\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/observatoriomovilidad.es\/en\/wp-json\/wp\/v2\/comments?post=5687"}],"version-history":[{"count":0,"href":"https:\/\/observatoriomovilidad.es\/en\/wp-json\/wp\/v2\/posts\/5687\/revisions"}],"wp:attachment":[{"href":"https:\/\/observatoriomovilidad.es\/en\/wp-json\/wp\/v2\/media?parent=5687"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/observatoriomovilidad.es\/en\/wp-json\/wp\/v2\/categories?post=5687"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/observatoriomovilidad.es\/en\/wp-json\/wp\/v2\/tags?post=5687"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}